Möchten Sie zur Deutsche Flagge Deutschen Sprache wechseln?

banjo bolt M8x1 - small banjo bolt G-Lader G40 and G60

banjo bolt M8x1 - small banjo bolt G-Lader G40 and G60
For a larger view click on the thumbnail

3,99 €
19 % VAT incl.
Add to cart
Add to wishlist

* Shipping time: ca. 2-5 working days 3-4 Days
Product no.: g60-191
Gewicht: 0,050 kg
Manufacturer: Theibach-Performance
More products of: Theibach-Performance



  • Description
  • More images
  • Recommendation
  • Customers also bought

Banjo bolt for connecting the oil supply line to the G-loader - for G40 and G60

M8x1

More Informations:

VW Model / Engine CodeCorrado 53i (PG) G60 1,8 Ltr. 160 HP 1988-1993 Golf 2 19E (PG) G60 1,8 Ltr. 160 HP 1990-1991 Golf 2 Limited 19E (3G) 16V G60 1,8 Ltr. 210 HP 1989 Golf 2 Rallye 19E (1H) G60 1.8 Ltr. 160 HP 1989-1991 Passat B3 35i (PG) G60 1.8 Ltr. 160 HP 1989-1993 Polo 2F (PY) G40 1,3 Ltr. 113 HP 1991-1994
banjo bolt M8x1 - small banjo bolt G-Lader G40 and G60

Recommended products:

G60 G-charger

sealing ring M8

suitable for small banjo bolt on G-loader

* Shipping time: ca. 2-5 working days
0,39 €
19 % VAT incl. excl. Shipping costs

Customers who bought this product also bought the following products:

Oil supply line / oil line G40 and G60 loader / G-charger

Oil feed line and attachment material for G40 and G60 loaders

* Shipping time: ca. 2-5 working days
69,90 €
19 % VAT incl. excl. Shipping costs
Reconditioning kit G60 loader / G-Lader - large

complete maintenance kit for the G60 G-Lader - Sintimid, FAG, Theibach-Performance

* Shipping time: ca. 2-5 working days
Our previous price 299,90 € Now only 264,90 €you save 12% / 35,00 €
19 % VAT incl. excl. Shipping costs
Banjo bolt M10x1 - large banjo bolt G-Lader G40 and G60

big banjo bolt M10x1

* Shipping time: ca. 2-5 working days
4,29 €
19 % VAT incl. excl. Shipping costs
sealing ring M8

suitable for small banjo bolt on G-loader

* Shipping time: ca. 2-5 working days
0,39 €
19 % VAT incl. excl. Shipping costs
sealing ring M10

suitable for large banjo bolt on G-loader

* Shipping time: ca. 2-5 working days
0,39 €
19 % VAT incl. excl. Shipping costs
Key / Wedges main shaft for G40 and G60 supercharger / G-charger
Key long (36mm) and key short (12mm)
* Shipping time: ca. 6-10 working days
6,49 €
19 % VAT incl. excl. Shipping costs
Manufacturer
Theibach-Performance