Möchten Sie zur Deutsche Flagge Deutschen Sprache wechseln?

G-Lader overhaul G40 loader

G-Lader overhaul G40 loader
For a larger view click on the thumbnail

from 529,90 €
19 % VAT incl.
Surface
In this version, price/article
Add to cart
Add to wishlist

* Shipping time: ca. 2-3 weeks 3-4 Days
Surface
Cleaning in parts washer3-4 Days
Glass bead blasting3-4 Days
powder coating1 Week
Product no.: g40-007
Gewicht: 8,000 kg
Manufacturer: Theibach-Performance
More products of: Theibach-Performance



  • Description
  • Recommendation
  • Customers also bought

The G-loader is disassembled and always cleaned in the parts washer and then checked.

During the overhaul all wearing parts are replaced:
- 2 main bearings housing (FAG)
- 1 displacement bearing INA
- 2 auxiliary shaft bearings (FAG)
- 5 shaft sealing rings (TP - Theibach Performance)
- 8 sealing strips (Sintimid)
- 1 toothed belt 11.5 mm (Gates)

Of course, assembly and functional testing as well as disposal of old parts.

For further services beyond the offer specified here, it is a further offer on request for which a separate request form can be filled out and sent. If you would like to bring the G-Lader to us personally, please make an appointment.

 
In this video you can see how a G-Lader overhaul is carried out in our company:
You can find more interesting videos on our YouTube channel.

More Informations:

VW Model / Engine CodePolo 2F (PY) G40 1,3 Ltr. 113 HP 1991-1994

Recommended products:

G60 G-charger

Oil supply line / oil line G40 and G60 loader / G-charger

Oil feed line and attachment material for G40 and G60 loaders

* Shipping time: ca. 2-5 working days
69,90 €
19 % VAT incl. excl. Shipping costs
G40 and G60 loader / G-loader Powder coating

for housings of G60 and G40 G-chargers in many RAL and special colours possible

* Shipping time: ca. 2 Weeks
149,90 €
19 % VAT incl. excl. Shipping costs
Fixing screws for G40 G loader on the mounting plate

4 screws 8.8

* Shipping time: ca. 6-10 working days
4,99 €
19 % VAT incl. excl. Shipping costs

Customers who bought this product also bought the following products:

Oil supply line / oil line G40 and G60 loader / G-charger

Oil feed line and attachment material for G40 and G60 loaders

* Shipping time: ca. 2-5 working days
69,90 €
19 % VAT incl. excl. Shipping costs
RS2 machining G40 G60 G-Lader - Stage II

faster boost pressure build-up and torque increase

* Shipping time: ca. 6-10 working days
189,90 €
19 % VAT incl. excl. Shipping costs
Camshaft Schrick asymmetrical 252°/276° VW Polo G40

our recommendation for the VW Polo G40 - increased performance with full suitability for everyday use

* Shipping time: ca. 6-10 working days
339,00 €
19 % VAT incl. excl. Shipping costs
5PK belt drive - Kit VW Polo G40

Conversion kit for 5PK V-ribbed belt

* Shipping time: ca. 6-10 working days
134,90 €
19 % VAT incl. excl. Shipping costs
K&N Air Filter VW Polo G40

with higher air flow rate

* Shipping time: ca. 6-10 working days
74,90 €
19 % VAT incl. excl. Shipping costs
Manufacturer
Theibach-Performance